FFJ started deliver of HTS tapes to Vision Electric Super Conductors GmbH
2025/06/09
FFJ started supplying HTS tapes to Vision Electric Super Conductors GmbH (VESC)by 2027, VESC will manufacture and install a 600m long superconducting busbar system with 200,000 Ampere current-carrying capacity to power electrolysis cells at smelter facility in Hamburug, Germany.
Faraday Factory Has Started Delivery of Superconductor Tapes for 200,000 Ampere Busbar to be installed at Aluminum Smelter Plant in Hamburg, Germany
Faraday Factory Has Started Delivery of Superconductor Tapes for 200,000 Ampere Busbar to be installed at Aluminum Smelter Plant in Hamburg, Germany

